SAGD Well Pads and Central Processing Facility


Northern AB, Canada


Overview

Tarpon was contracted by a leading oil and gas producer to supply seven substations for an oil sands project situated in the Athabasca Region; three buildings were used in the site’s Central Processing Facility (CPF) and four buildings were placed at the Well Pad site. The main building was designed for medium and low voltage distribution to meet the client’s environmental requirements.

All units were built to accommodate the installation and operation of additional electrical equipment. Tarpon’s team of technical professionals provided the client with solutions for
engineering, design and installation of all electrical and control systems.